In anticipation of our upcoming move, I’ve been planning the layout of our new location. This is the pretty color coded CAD drawing of the layout of our new location. The right side is the workshop where the Wandertec BONGO bike cargo trailer and other Wandertec products will be designed and manufactured. The top left is the office where we will answer calls, order products, list and blog about products, fine tune the websites and keep track of numbers. The center top is the shipping center where great cycling products from Bike Trailer Shop, Bike Kid Shop and Bike Bag Shop are sent out from. The bottom left and center is where all of those great cycling products will be organized and stored. We are anticipating getting in there in about 2 or 3 weeks from now and will likely have a Grand Opening celebration sometime in June.