Stuart’s been working hard on organizing the assembly/repair area of the shop, building a variety of metal tables for work surfaces and organizing all of the tools. With this project completed, he is back to wrapping up the massive bike rack sculpture project before diving into bike trailer prototyping mode. Stu is pictured here with the new tubing bender that we just picked up for building a rail system for the Wandertec BONGO and possibly for some bike racks.